Imagine you are a doctor running behind schedule. This has backed up all your other appointments for the day and has led to several grumpy and rude patients. How do you balance being a good listener and providing solid care with the logistics of the day?

Answers

Answer 1

Answer:

Take some breaks in between each patient. Maybe try doing some breathing exercises or some work to get your mind off some things.  

Explanation:


Related Questions

What are 2 things that your hormones are in control of? please i need this answred

Answers

Answer:

Either  growth, development, puberty, regulating sugar levels, bone growth and appetite.

Explanation:

Explain how being health literate helps you achieve and maintain good health.Chapter 1 Lesson 1

Answers

Answer: Health literacy can help us prevent health problems and protect our health, as well as better manage those problems and unexpected situations that happen. They aren't familiar with medical terms or how their bodies work.

Explanation:

What nutrients from food
are getting passed from
the inside of the intestines
(lumen) across the lining?

Answers

Answer:

The epithelial cells of the villi transport nutrients from the lumen of the intestine into these capillaries ( amino acids and carbohydrates) and lacteals (lipids).

The epithelial cells of the villi transport nutrients from the lumen of the intestine into these capillaries ( amino acids and carbohydrates) and lacteals (lipids)

Do you think there will be a cure for cystic fibrosis?

Answers

Answer:

I DO NOT THINK THAT THERE WILL BE A CURE ANYTIME SOON BECAUSE THEY ARE STILL WORKING ON A CURE FOR MANY OTHER THINGS.

Explanation:

oops sorry, I was on caps lock! my bad!

Answer:

Hey Alicia! Long time no see! Hru? And to answer your question no there is no cure for cystic fibrosis but I think there is treatments to help calm it

Explanation:

Hope we could talk again Alicia!

Select the skills or techniques being exhibited by the healthcare professional below. (Check all of the boxes that apply)

A patient has just been told she has an underactive thyroid gland. The patient asks whether she will need medication to relieve her symptoms, and the doctor says yes and explains how the synthetic thyroid hormone medication works. The doctor then provides the patient with a prescription and a pamphlet detailing symptoms, treatment, and answers to questions patients commonly have.

good listening skills

directing patient to a support group

offering written educational materials

providing take-home educational materials

Answers

Answer: good listening skills

offering written educational materials

providing take-home educational materials

Explanation:

Based on the information that has been provided in the question, the skills or techniques that the healthcare professional below exhibited include:

• good listening skills.

• offering written educational materials.

• providing take-home educational materials.

The doctor has good listening skills as he heard what the patient had to say and he explained what was meant by underactive thyroid gland.

The prescription given and pamphlet shows that the doctor offered written educational materials while also providing take-home educational materials.

Answer: good listening skills

offering written educational materials

providing take-home educational materials

Explanation: Hope it helps ^w^

Please Help 100 Points

Answers

Answer:

You should try to look for cultures in Korea, there very interesting. To be honest its not hard to make a paragraph about this. You could easily do this by yourself.

Explanation:

South Korea supports religious freedom.

Confucianism, Buddhism and Christianity are the main formal religions.

Many Koreans believe in the ancestral spirit and observe Confucian rituals.

Confucianism is a political and social philosophy that pervades Korean culture.

here are some cultures and some of their beliefs.

Explanation:

This Is Your Answer

Hope It Helps U

What is the best synonym for sedentary?

Answers

Still,dormant or sitting


Which STRETCHES are similar to Isometric exercises in that you are
holding your position without moving

Answers

Answer:

Static

Explanation:

Isometric exercises are defined as the exercise in which muscle tension is created without changing the length of muscles.

Static Stretches are similar to Isometric exercises because it also increases tension in a muscle but the length remain same. for example: shoulder stretch, hamstring stretch and side bends.

Hence, the correct answer is "Static".

What's the best personality for someone to have in ur opnion

Answers

A goofy and empathetic personality because you can laugh with them but also you could tell them something and they could understand even though they haven’t gone through it

Hmmm, in my opinion it would have to be respectable, weeby, and bubbly. But I also like mean people haha.

What is the best initial treatment of inhalation of vapors or gases

Answers

Answer:

Oxygen is the mainstay of treatment for people who are exposed to gases. If lung damage is severe, a person may need mechanical ventilation. But any person who has breathing problems after inhaling a gas is usually monitored in a hospital overnight to ensure that serious complications do not occur

Explanation:

Explain how social prejudice affects people of short stature.(I need this now)

Answers

Well normally women don’t like dating short guys.... not sure if this helps sorry

Answer:

People often confuse lack of stautre as lack of authority. Tall people are often viewed as trustworthy and reliable.  Myriad studies indicate that they are considered more dignified, trustworthy, intelligent and authoritative. They have a "stature" in short. Because of this many people of shorter stature are often asscociated powerless and are treated as such.

Explanation:

Clues to whether or not a health information website is reliable can sometimes be found right within the site’s web address. Select the website address endings that generally indicate trustworthiness. (Check all of the boxes that apply)

.org

.gov

.edu

.com

Answers

The answers you’re looking for are:
.org and .com

It would be .org, .gov, and .edu. Anyone can create a .com website so these are not always trustworthy

What is your opinion about Social Media Addiction?
its for class c:

Answers

My opinion on social media addiction is that it can be harmful to young children. social media causes general dissatisfaction with life in users, but also increase the risk of developing mental health issues such as anxiety and depression.
I believe it is a huge problem (However, due to this pandemic it is genuinely the safest form of social interaction.) Aside from that, it’s not healthy to rely on validation from people on social media.

If I don't feel interested in school what should I do to help keep me motivated

Answers

Answer: Don't give up because

Explanation:

Find ways to keep you motivated you shouldn't give up on school, school is very important depending on how you do in school, your future can suck or be awesome that's all I have to say just don't give up.

how can peer meditation program help make your school safer

Answers

Answer:

Peer mediation programs offer schools an alternative to traditional disciplinary practices and help schools become safer places. ... Trained mediators reportedly exhibit increased self-control, self-confidence, and problem-solving skills which they use not only at school, but at home and with friends outside of school.

Answer:

yxzu zhbxgghrbeheurhfvjfudgr

please help with this i will give you a crown if you answer first
Which of the following best defines noise pollution?

a possible threat to the living and non-living components of Earth
the material found in nature that can be used by humans
the act of protecting the natural sounds in the environment
the unwanted sound caused by human activity that disrupts human and animal life

Answers

Answer:

The answer is the unwanted sound caused by human activity that disrupts human and animal life

Explanation:

Which of the six components of health best demonstrate the importance of good nutrition? BE QUICK

A social health
B environmental health
C physical health
D spiritual health

Answers

Answer: Physical health
Hope it helped
psychical health, it’s C

CAN SOMEONE PLS PUT THIS IN ORDER FROM TOP TO BOTTOM OR WHAT HAPPENS FIRST TO LAST PLS
Mucus membrane
Natural antibiotic(s)
Immune system
White blood cells
Leukocytes
Lymphatic system
Antigen
Phagocyte
Lymphocyte
T-cells
B-cells
Antibody/antibodies
Fever
Communicable disease
Infection
Pathogen
Skin ( as a protective barrier)
vaccine/vaccination
Stomach
First line of defense
Second line of defense
Third line of defense

Answers

Answer:

Explanation:Mucus membrane

Natural antibiotic(s)

Immune system

White blood cells

Leukocytes

Lymphatic system

Antigen

Phagocyte

Lymphocyte

T-cells

B-cells

Antibody/antibodies

Fever

Communicable disease

Infection

Pathogen

Skin ( as a protective barrier)

vaccine/vaccination

Stomach

First line of defense

Second line of defense

Third line of defense

Which is the HACCP Principle sets a minimum or maximum parameter or boundary that must be met to prevent a hazard? * 5 points Conduct a Hazard Analysis Take Corrective Action Establish Critical Limits Establish Monitoring Procedures

Answers

Answer:

The correct answer is - Establish Critical limits.

Explanation:

There are seven principles in HACCP that are CCP identification, hazard analysis, establishing critical limits, corrective actions, monitoring procedures. verification procedures, and documentation and record-keeping to meet the desired goals.

Establishing the critical limits for the particular hazard sets the minimum and maximum limits or values of a particular condition to prevent a hazard. The maximum and minimum values act as the boundaries if moving away from these boundaries there might chance of the hazard.

Why is hyper trophy important?

Answers

Answer:

because it allows for muscle growth to occur by pushing them to their maximum effort. that's why bodybuilders train until their muscles are sore, to reach hypertrophy and make it grow.

An Information Technology worker who follows the Programming and Software development pathway most likely enjoys

overseeing computer and information system projects.
setting up and maintaining computer networks and databases.
helping others with computer applications and operating system problems.
writing code for computer applications and operating systems.

Answers

Answer: D.) writing code for computer applications and operating systems. And have a bless day and God love you and so do I <3 !

An Information Technology worker who follows the Programming and Software development pathway most likely enjoys overseeing computer and information system projects. Thus, option A is correct.

What is programming and software development?

The programming and software development pathway includes performing tasks like software design, development, and implementation. The skills and knowledge required includes computer operating systems, software development and computer language programming.

Software is the term for the intangible. The software is the most important aspect. Software is a collection of rules, data, or algorithms used to run machines and perform certain tasks. Apps, scripts, and programs that run on a mobile device are referred to as software.

Application software is classified into two categories: systems software and applications software. Database programs, web browsers, spreadsheets, and word processors are examples of application software.

Therefore, An Information Technology worker who follows the Programming and Software development pathway most likely enjoys overseeing computer and information system projects. Thus, option A is correct.

Learn more about  Information Technology on:

https://brainly.com/question/14426682

#SPJ6

What is the name of the condition in which tissue from the lining of the uterus grows outside the uterus?


ovarian cysts


menstruation


infertility


endometriosis

A physician who can diagnose and treat mental disorders is called a _____.


psychologist


psychiatrist


social worker


massage therapist

Which is not a risk factor for clinical depression?


a prolonged stressful situation


being sad and tired every once in a while


having a close family member with a mood disorder


having a previous bout of depression

Answers

1. endometriosis
2.psychiatrist
3. not sure,,, it’s either the mood disorder one or being sad and tired every once in a while

Answer:

1. Endometriosis.

Explanation:

I have a close friend, I love everything about them. We have just about everything in common. We finish each others sentences, have the same taste in music and humor, we even unintentionally match ( clothing ) when ever we hangout. I love everything about them but I'm not physically attracted to them, but their on my mind24/7. What should I do lol.?

Answers

Answer:

Awwww it just sounds like y'all are true bestfriends... Or even honestly u can fall in love and not be physically attracted to them... you can be more in love with the soul & that person AS A WHOLE you know? , and that's the best thing to me personally

Explanation:

Which type of fire should never be put out with water?


clothing fire


grease fire


paper fire


wood fire

Answers

Grease Fire

Explanation:

Water and Oil don't mix

Grease fire! Your welcome

" Smoking or drug addiction by expected mother is more dangerous. Why?" Explain.​

Answers

Smoking or drug addiction for an expecting mother is more dangerous because not only are the chemicals affecting her but they are affecting her baby as well if addiction continues through to the birth of the child the baby can experience withdrawal symptoms and can be underdeveloped

What message is this ad/product sending to the audience (other than "buy it")? Was there a memorable slogan?

Answers

Answer:

please put in video link

Explanation:

health is all about how well your body function

Answers

This is false. Your health is determined by body mind and soul

What are three parts of the peripheral nervous system? Someone wanna talk

Answers

Answer:

The autonomic nervous system is divided into three parts: the sympathetic nervous system, the parasympathetic nervous system and the enteric nervous system. The autonomic nervous system controls smooth

How many minutes are in a quarter during a high school game?
Group of answer choices

8 minutes
10 seconds
2 hours
30 minutes

It’s basketball too PLEASE HEEEEELP

Answers

I’m sure it’s 8 minutes !

what is something you need in order to live?
A) sleep
B) food
C) Sunlight
D) Vitamins

Answers

Answer:

b I am pretty sure but now I'm second-guessing myself you also need sleep and sunlight and vitamins but I think you need food more. SORRY!

Other Questions
How does the article "Caring for Vets Should Be National Duty" develop the central ideas that the VA Mission Act is a step in the right direction and that the law will not be enough to improve care for veterans?1.by explaining how the law will improve conditions for veterans and emphasizing the shortcomings of the law2.by describing the conditions that led to the law being passed and including statistics that show the law will fail3.by explaining how the law was passed and describing what the next law passed should include4.by explaining how many people will benefit from the law and describing how some people will not benefit. what does it mean when Molly is described as being as jittery as the squirrel Find the mean, median, mode, and range for each set of data 21.5, 35.5, 49.5, 16.3, 35.5 Whats the difference packet switching and message switching?? LOOK AT PICTURE FOR QUESTIONWhat is the second daughter element from the nuclear fission reaction shown below? (solvefor x) *(3 Points) I'm too lazy to do this, so like- anyone wanna do it for me? lol HELP ME ASAP AND IF YOU GET THE ANSWER FIRST AND CORRECT I'LL PUT YOU THE BRANIEST! In addition to his hourly rate, Mr. Smith is paid $2.20 for each watch he fixes. Write an expression for his income if he fixes r watches per hour?9.5 is hourly rate. I want to see a Oc girl with a buzz cut haircut thank you or she cold have a Mohawk please add a drawing if g(x)=3x^2+2x-1, find g(0) What is the longest side of the triangle with vertices of (1,4), (3,4), and (3,6)? What is "four thousand, seven hundred two" in standard form? If an 80 kg swimmer pushes off a pool wall with a force of 250 N, what is heracceleration? 12. Suppose a reward for a CS follows a probabilistic schedule. If the probability of receiving the reward increases then: a) firing will increase for CS and increase for US b) firing will increase for CS and decrease for US c) firing will decrease for CS and decrease for US d) firing will decrease for CS and increase for US e) none of the above; firing will remain unchanged for CS and US A surfboard was originally priced at $75 but went on sale for 60% off. If Quincy bought the surfboard and paid 10% sales tax, how much did he pay in total? What does 2/3 + 1/3 + 5/3 equal? Part CHow many combined bits of storage are there on the two tablets?Part DIncluding the phones, tablets, and cloud, how many total bits of storage does the family have altogether? Type your answer in scientific notation.Part ETheresas computer at home has 1 terabyte of storage. How many more bits of storage does her computer have than the combined bits available on her familys phones, tablets, and cloud storage? Type your answer in scientific notation. Ana Y yoA. Sois B.SoyC.SomosD.Son ASLIdentify the reflective pronoun in the following sentence: The boy taught himself to play the piano.Answer choices are:- boy- taught- himself- play help me please, what's wrong with this introduction?